Market-leading solution in Europe
INTEGRA-pw – Modular system for vehicle impact protection in car parks
INTEGRA-pw is our patented, modular security system that has been specially developed for use in multi-storey car parks, logistics centres and similar infrastructures. It combines several security-related functions in a single solution:
The system complies with the highest European safety standards and can be flexibly adapted to individual structural conditions.
Approved and certified by:


Membership in associations:








INTEGRA-pw – dynamic safety for parking structures
The video shows how INTEGRA-pw absorbs vehicle impact energy through elastic deformation and controlled damping.
Compared to rigid concrete solutions, forces are reduced and transferred in a targeted way – protecting vehicles, occupants and the supporting structure.
The system combines structural intelligence with flexibility in planning and efficient repair after impact.
Your added value
Cost-effectiveness
INTEGRA-pw reduces material consumption compared to conventional static systems such as heavy steel structures or concrete parapets, resulting in significant cost savings.
Certified safety
INTEGRA-pw ensures tested safety in accordance with all European building regulations:
• EN 1991-1-1 (Annex B)
• EN 1991-1-7
• BS 6399-1 and BS 7818 (British standards)
• General technical approval from the German Institute for Building Technology (Z-14.7-882)
Flexible design
Enables the integration of façade elements such as solar panels, wood and aluminium slats, greenery and coloured powder coatings,
handrails and glare protection for individual design.
Versatile adaptability
The right solution for every application – no matter whether your column spacing is 5, 8, or 10 meters.
INTEGRA-pw offers flexible solutions for concrete, steel or timber structures, backed by extensive engineering experience to meet all customer requirements.
Reduced assembly times
An INTEGRA-pw element can be fully installed in less than 30 minutes.
With our pre-assembly service, only 4x screws need to be fastened to the columns on site.
Column-free span distances up to 5.5 meters
No damage to the ceiling in the event of impact –
Quick and easy installation thanks to direct fastening
to the load-bearing column structure.
High ventilation cross-section
The high air permeability of the INTEGRA-pw system eliminates the need for expensive ventilation systems.
Low maintenance and care
Thanks to screw locks and the use of galvanised round rods in accordance with DIN EN ISO 1461, maintenance is reduced to an absolute minimum.
Why INTEGRA-pw?
‘Less is more’ – reduced material consumption but greater safety
More material does not always automatically mean more safety. The decisive factor is how energy is absorbed in the event of an impact.
Thanks to its elastic and damping function, INTEGRA-pw can absorb the energy released in a vehicle collision in a targeted and controlled manner instead of passing it on unchecked.
The result: less damage to the vehicle, more protection for occupants – and maximum safety without excessive use of material.
Efficient. Tested. Proven in practice.


System products for different load requirements
The patented INTEGRA-pw system consists of a specially designed steel mesh panel (certified within the general technical approval) and an integrated fastening.
The panel length can be adapted to each project, with spans of up to 5.5 m. The more fastenings are used, the higher the impact loads the system can safely absorb.


- Load requirements: Loads due to people up to 1.0 kN/m in accordance with EN 1991-1-1
- Vehicle loads up to 2.5 t in accordance with EN 1991-1-1, Annex B or EN 1991-1-7, Annex C
- Area of use: multi-storey car parks
- Safety barrier for people and cars with a total weight of up to 2.5 t
- Column-free span widths up to 5506 mm


- Load requirements: Loads due to people up to 1.0 kN/m in accordance with DIN EN 1991-1-1/NA
- Vehicle loads up to 3.0 t in accordance with DIN EN 1991-1-7/NA
- General building approval No. Z-14.7-882
- Area of use: multi-storey car parks
- Safety barrier for people and cars with a total weight of up to 3.0 t
- Column-free span widths up to 5506 mm


- Load requirements: Loads due to people up to 1.0 kN/m in accordance with EN 1991-1-1
- Vehicle loads up to 3.5 t in accordance with EN 1991-1-1, Annex B or EN 1991-1-7, Annex C
- General building approval No. Z-14.7-882
- Area of use: multi-storey car parks
- Safety barrier for people and cars and vans up to 3.5 t total weight
- Column-free span widths up to 5506 mm


- Load requirement: Loads due to people up to 1.0 kN/m in accordance with DIN EN 1991-1-1
- Area of use: safety barrier for people in buildings, mezzanines, connecting bridges between buildings and wherever people need to be protected against falling
- between buildings and wherever people need to be protected against falling
- Parapet barrier for loads due to people up to 100 kg
- Column-free span widths up to 5506 mm


- No load requirement
- Area of use: for the closure of complete storey heights in multi-storey car parks
- Protection against vandalism
- Basis for various façades
- Column-free span widths up to 5506 mm


Design options
Photovoltaic integration on the INTEGRA-pw – patented innovation
Since early 2025, projekt w has developed a new patented system for directly integrating solar panels into the INTEGRA-pw safety barrier.
This solution allows photovoltaic modules to be installed safely and efficiently without additional substructures – generating energy, saving space and integrating architecturally.
Another step towards sustainable construction with a system – tested, economical and future-oriented.
Product configurator
| INTEGRA-pw LOCK | INTEGRA-pw 0.1 | INTEGRA-pw 2.5 | INTEGRA-pw 3.0 | INTEGRA-pw 3.5 | |
|---|---|---|---|---|---|
| Maximum span | 5.506 m | 5.506 m | 5.506 m | 5.506 m | 5.506 m |
| Closure / greening | |||||
| Loads due to people | |||||
| Vehicles up to 2,5 t | |||||
| Vehicles up to 3,0 t | (only DE) | ||||
| Vehicles up to 3,5 t | |||||
| Fastening set | – | 2 | 4 | 4 | 8 |
| Fastening set LOCK | 4 | 2 | – | – | – |
Interesting facts about INTEGRA-pw safety barriers for multi-storey car parks
Personal advice
Our sales staff will be happy to advise and provide you with detailed information! We look forward to hearing from you!










Burkhard Kahl-Pfeiffer


Phone: +49 5258 9828-530
Mobile: +49 173 5455787
b.kahl-pfeiffer@projekt-w.de


Nils Welschof


Phone: +49 5258 9828-525
Mobile: +49 152 28549552
n.welschof@projekt-w.de


Jeremy Waters


Phone: +49 5258 9828-526
Mobile: +49 160 94751631
j.waters@projekt-w.de


Dipl.-Ing. Alejandro Uribarri Criado


Phome: +49 5258 9828-511
Mobile: +49 173 5664458
a.criado@projekt-w.de











































